Understanding Primavera P6 Percent Complete Types

by | Sep 29, 2020 | Oracle Primavera P6 PPM

When you create a new project in P6 the default Percent Complete Type is Duration. Is this the best option and do you understand the difference between Duration, Physical and Units Percent Complete?

It is my opinion the this should always be changed to Physical for several reasons.

Click on this link>>> to read an article on P6 percent Complete Types and how they calculate.

Accelerate you understanding of scheduling software and advance your career with Eastwood Harris books and training material on:

  • Microsoft Project,
  • Oracle Primavera P6 and
  • Elecosoft (Asta) Powerproject

Details at  https://www.eh.com.au

Paul E Harris

Director Eastwood Harris Pty Ltd

Accelerate your understanding of scheduling software to advance your scheduling career and be able to prepare better schedules with Eastwood Harris books, online videos available through Udemy and training material on:

Details at  https://www.eh.com.au

Paul E Harris

Director Eastwood Harris Pty Ltd

 

Categories

Tags